Mark Fisher, Electrical Engineer

Mark Fisher, an Electrical Engineer at KEC, has been with the cooperative for almost two years. He plays a role in designing major infrastructure projects and ensuring reliable power for our growing cooperative and community.

Tell us about your educational background and previous work experience that led you to KEC.

My path to engineering is practically in my DNA. Born in Spokane and raised in Wenatchee, I am the son of an electrical engineer. Growing up with four siblings, I learned the value of hard work early on, earning my Eagle Scout rank by the age of 15. I eventually headed to Bozeman to attend Montana State University, drawn by their solid engineering program and a climate I enjoyed.

Before joining KEC, I worked for an electrical engineering consultant in Billings, Montana. The transition to KEC actually started with a tip from my dad, who let me know KEC was hiring. I decided it was the perfect time to make the leap and move closer to my family in the Wenatchee area.

What does a day look like for you as an electrical engineer?

A typical day for me starts at 6 a.m. with a much-needed cup of coffee before jumping into my design and planning role. The engineering department is focused on implementing KEC’s Construction Work Plan. This five-year plan is refreshed annually and outlines all the work needed to ensure KEC’s electrical system can efficiently serve present load as well as forecasted future growth. It specifically details when and where new substations, major power lines, and other significant investments will be required. The engineering department produces designs and procures materials while the operations department handles the construction. The goal of these efforts is to ensure the KEC system maintains the capacity and reliability our members depend on.

Tell us about projects you are working on.

I am currently finalizing the designs of several upgrades to KEC’s substations in the northern part of KEC’s service territory. This includes upgrades to the substation metering, security systems and internet connectivity. I have also been adding transfer switches at substations to provide backup power sources to the AC and DC systems, significantly improving reliability when there are outages or maintenance needs.

In addition, I am focused on a new substation that is under construction in Rathdrum north of Boekel Road on Ramsey Road. I am leading this project, overseeing construction, and preparing for commissioning activities this fall. This substation is planned to be in service by December 1, 2026.

What is the biggest challenge in your job?

Juggling the moving parts of multiple concurrent projects can be a real challenge. The engineering department uses a scheduling tool to ensure designs are developed and material is received well in advance of construction.

What is the best part of your job?

For me, the best part of the job is the people and the process. I enjoy a good rapport with my coworkers and being involved with the project every step along the way. I appreciate going out into the field to do inspections and watch the construction process unfold from start to finish, whether that is pouring foundations, erecting control buildings, setting equipment, or checking out detailed wiring and control systems. I love to stay busy and I find the work engaging.

What is your favorite thing in (or about) our community?

When I am not coordinating substation upgrades and builds, I like to unplug and get some fresh air. You can find me hiking the trails at Tubbs Hill or English Point, or enjoying a game of cornhole.