After receiving my associate’s degree in drafting and design, I worked for several electrical transmission, distribution, and surveying consulting firms. During this time, I also worked with KEC as a consultant which allowed me to get to know the staff and experience the variety of projects I would be involved with. These factors, along with KEC’s location were the considerations that convinced me to apply for a job at KEC.
In my current role, I am responsible for electric distribution line design, preparation of construction documents, field staking of electric line routes and equipment locations, and mapping of these facilities. My typical day involves work on capital construction projects and road improvement projects. This requires long-term planning and continued coordination with local agencies such as the Idaho Transportation Department and their consultants. My work ensures a project meets deadlines, budgets, code, and safety compliance, and provides continued system reliability for the membership.
The biggest challenge of my job currently is material procurement. Since the pandemic, material and equipment cost increases have created extended timelines and inflated costs which historically have not been an issue. Although there appears to be some light at the end of the tunnel, lead times on conductors, transformers, and specialized equipment can be 12 to 24 months once an order is placed. Proper planning and coordination for major projects is critical.
The best part of my job is working on a variety of unique and complicated projects. These can range from large commercial projects, substations, new residential services, high and low-density residential subdivisions, and road improvements.
Tell us about the plans for a new substation in Rathdrum.
KEC is currently in the design phase of a new substation in Rathdrum near Ramsey and Boekel Roads. This substation will improve reliability for KEC members in northern Kootenai County by providing connections between KEC’s other existing substations in Rathdrum, Twin Lakes, and Athol. To connect the new substation to our electric service area, KEC will also be constructing a new transmission line, installing new underground power lines and rebuilding and upgrading our existing overhead power lines.
I’m responsible for the design and field staking of the power line routes and equipment locations and coordinate with members who may be impacted as part of the project’s construction. Also, as a KEC member, I am cognizant of project costs. I strive to design a robust and cost-effective solution that improves reliability for all members.
I enjoy hunting, fishing, snowmobiling, and classic vehicles. A short drive to Mullan, Clark Fork, Bonners Ferry (where I grew up), Lewiston, or Spokane allows me to enjoy these hobbies year-round.