As a general foreman, I don’t have a specific crew that I work with. I help oversee all the crews (we have 6) and work closely with KEC’s engineering staff, who design the power lines that distribute power throughout KEC’s electrical system. I also coordinate with the foremen as these design jobs are completed and need to begin the construction phase. In addition, I respond to power outages. I’m pretty much on call 24 hours a day, 7 days a week.