The results revealed that our previous facilities were inadequate for current and future space needs. In fact, our Hayden facilities only met approximately 54 percent of our anticipated square footage needs based on our historic growth. The previous buildings would require moderate-to-significant modifications to meet our needs and building code requirements. While repairs/replacements would have improved the physical conditions, energy efficiency, and overall layout, items like traffic flow and operational efficiencies could not be overcome at our former location.