There is a $250 application fee. If we do not have to replace existing infrastructure to accommodate the proposed system size and configuration, then there is no additional cost to interconnect with the power grid. If we do have to upgrade our infrastructure to accommodate the proposed system, then the cost will vary depending on the scope of work. The applicant would be notified of that cost.